Our custom homes in southern Maine are built for $300 to $400 per finished square foot, including finished lower levels, all the site work and the town's permit and impact fees. Land is separate. Where a home lands in that range depends mostly on the finishes you choose.
Last updated October 2026 · Written by Nick Estes, who has built more than 100 homes in southern Maine since 2003
Here's what our homes typically cost, before land, including site work and town fees:
Typical cost, before land
$600,000 To $800,000
$750,000 To $1 million
$900,000 To $1.2 million
$1.2 million To $1.6 million
$1.5 million To $2 million
Estimates, not quotes. Your price depends on the design and the finishes you choose.
Cost figures for Maine vary widely, mostly because they include different things. National cost guides often quote construction only, with land, site preparation, permits and utilities listed separately. HomeGuide, for example, puts custom homes in Maine at $350 to $450 or more per square foot for construction alone, and luxury coastal or waterfront homes above $500. Statewide averages that look much lower usually describe smaller, simpler homes.
Does it include site work: the well, septic, driveway and power?
Does it include the town's permit and impact fees?
Is it a fixed price, or full of allowances that can grow?
Our answer to all three is yes, yes and fixed.
Site work is where Maine homes differ most from the national averages, and where budgets most often go wrong. Here's what it typically involves:
Most homes outside town water use a drilled well. The average Maine well is 100 to 200 feet deep, according to the state geologist, and a typical 200-foot well costs roughly $6,000 to $16,000 nationally, depending on depth and the pump.
Many southern Maine lots use a private septic system, designed by a licensed site evaluator and permitted by the town's plumbing inspector. A conventional system can cost a few thousand dollars, while an engineered system for tougher soils runs $15,000 to $50,000 or more. Local builders put a typical new system at $20,000 to $30,000.
If the lot needs a new power line, Central Maine Power charges by the foot. As of April 2026, a CMP-built overhead single-phase line costs $40.96 per foot and an underground line $31.52 per foot, plus tree trimming where needed. The underground rate is lower because trenching and conduit are paid for separately. A long driveway can add up quickly.
Ledge is common in southern Maine, and removing it can add significant cost to a foundation. Frost depth means Maine foundations go deep, and the length and grade of the driveway matter too. This is why we evaluate every lot before you choose a plan.
Maine requires radon-resistant construction in new homes, with a passive system that can have a fan added if testing calls for it. Built in from the start, it typically costs around $1,000 or less.
With Estes, all of this is in your price. Well or water connection, septic or sewer, driveway, power and the foundation your lot needs are included in our $300 to $400 per square foot.
Every town charges for building permits, and many charge impact fees on new homes to help pay for schools, roads, parks and sewer capacity. A few examples:
Portland (2026): transportation $2,802, parks and recreation $1,461, and a wastewater fee starting at $2,448
Scarborough: a school impact fee rising from $5,570 to $11,391 for a new single-family home
Saco: about $8,170 for a home on city sewer
Our price includes your town's permit and impact fees, so they're never a surprise.
Land prices vary more than anything else in this guide. Building lots in Cumberland and York County run $200,000 to $500,000 on average, depending on the town, the size of the lot and the setting. Waterfront and coastal lots can cost considerably more.
If you don't have land yet, we develop our own lots and can help you find the right one. If you do, we'll evaluate it for free.
Finishes. The biggest factor. Cabinetry, counters, flooring, tile, lighting and fixtures can move a home from one end of the range to the other.
Size and shape. Larger homes usually cost less per square foot, because the kitchen, baths and mechanical systems are spread over more space. Complex rooflines and many corners cost more than simple forms.
Design. Vaulted ceilings, large windows and custom built-ins add cost, and character.
The site. Ledge, a long driveway, an engineered septic system or coastal requirements add to site work.
Here's how a typical project might come together:
$875,000
$300,000
$1,175,000
An illustration, not a quote. We'll give you a range for your own home in the first conversation.
Efficiency Maine offers rebates on heat pumps in new homes, from $1,000 to $3,000 per outdoor unit depending on household income. For new homes completed from January 1, 2027, the house must be built without a furnace or boiler to qualify. Incentives change, so check Efficiency Maine's current terms.
The most common reason custom home budgets grow is allowances: placeholder amounts for finishes you haven't picked yet. We avoid them entirely. You make every selection up front, from our curated collections, we price every line, and you sign one fixed price. Your selections are set before we break ground, which is what keeps the price from moving.
What it costs
Most custom homes are financed with a construction-to-permanent loan, which pays for the build in stages and then becomes your mortgage. Our Financing page explains how it works and who to talk to.
With us, $300 to $400 per finished square foot, including finished lower levels, site work and town fees. Land is separate.
With us, typically $900,000 to $1.2 million before land, including site work and town fees.
Not always cheaper, but often closer than people expect, and you get a new home with the plan and finishes you chose. See our Build vs Buy guide.
A typical drilled well runs roughly $6,000 to $16,000 and a septic system $20,000 to $30,000, more for engineered systems. Both are included in our price.
No. Our price includes the home, every finish, the site work and the town's permit and impact fees. Land is separate.
Most of our homes take five to six months from groundbreaking to keys.
Sources: HomeGuide (Cost to Build a House in Maine, December 2025; well and septic cost guides, 2025); Maine Geological Survey via Sun Journal (October 2025); Maine CDC; Central Maine Power, Getting Connected pricing (April 2026); Environmental Law Institute (Maine radon law); City of Portland Impact Fee FAQ (January 2026); Mainebiz; City of Saco; Efficiency Maine; Portland Press Herald (May 2026). Last updated October 2026.
Thirty minutes, no charge. We'll give you a realistic range in the first conversation.
Monday: 8am to 5pm
Tueday: 8am to 5pm
wedday: 8am to 5pm
Thursday: 8am to 5pm
friday: 8am to 5pm
Copyright 2026. Estes Development. All rights reserved.